EXECUTION STUDY

Companies must prepare execution plans, diagrams, and various calculation notes for approval by the project management team and the inspection office. FIRALA ELECTRIC can provide customized support at each of these stages, assisting project managers in order to optimize the construction site or alleviate an excessive workload for the design engineers.

  • Research into cost-effective alternatives, optimization, and assistance in equipment selection

  • Electrical installation plans for high and low voltage systems

  • Cabinet design and diagrams

  • Calculation note, standards NF C14-100 & NF C15-100: (Voltage Drops, Short Circuit Current, Protection Sequence and Selectivity, Cable Cross Section, etc.)

  • Note on Calculating the Illumination Level;

  • Completion of the DOE (Dossier des Ouvrages Exécutés);

CANECO CALCULATION NOTE

CANECO BT calculation notes economically determine cable cross-sections and all protective equipment. Its manufacturer database is constantly updated.

SCHEMATIC

We create electrical cabinet diagrams and control circuits. We rely on precise calculation notes to determine cable cross-sections, short-circuit currents, voltage drops, etc.

EXECUTION STUDY

We produce execution plans for high and low voltage electricity, reservation plans, incorporation... Our skills allow us to carry out projects in BIM Revit or Autocad 2D.

WRITING OF WRITTEN DOCUMENTS

The technical specifications document (CCTP) is an essential contractual document that requires appropriate drafting. It defines the client's needs and complies with regulations.

TECHNICAL PLAN

The electrical layout plan involves placing all electrical devices on the architect's plan. (Switches, power supply, lighting, low voltage, fire safety, emergency lighting, etc.)

DESIGN AND DIMENSIONING

Electrical engineering is at the heart of a building's operation. FIRALA ELECTRIC sizes, designs, and optimizes your electrical installations (high and low voltage) for your buildings, regardless of their use.

  • Design and sizing of electrical installations

  • Drafting of CCTP (Special Technical Specifications);

  • Establishment of DPGF (Breakdown of the Global and Lump Sum Price);

  • Preparation of written documents (technical specifications and detailed price schedule)

  • Location of electrical installations (high voltage, low voltage and fire safety system plans) on the background of the architect's plan;

  • Creation of electrical cabinet schematics and installation flowcharts

CANECO BT CALCULATION NOTE

CANECO BT calculation notes economically determine cable cross-sections and all protective equipment. It produces the diagrams and documents necessary for design, implementation, and verification. Its manufacturer database is constantly updated. A European leader, Caneco BT has obtained four technical approvals (NFC15-100, BS, RGIE, and NIN) which attest to the regulatory compliance of its calculations.

  • Calculations of electrical cables and sizing of the cross-section

  • The calculation of protection sizing, protection setting values, and short-circuit values

  • Cabinet design and diagrams

  • The general single-line diagram on CANECO BT, the network graph on CANECO EP, and the synoptic diagram on CANECO HT

  • Power balance, phase balancing, voltage drop, energy and differential selectivity: we provide the calculation report demonstrating that your installation complies with regulations for mandatory electrical inspections.